Daily Beirut

Lebanon

Litani River Authority: No New Leaks at Qaraoun Dam Spillway

The Litani River Authority announced that routine inspections of the Qaraoun Dam spillway revealed no new leaks, confirming the structure's overall safety and good condition.

··1 min read
Litani River Authority: No New Leaks at Qaraoun Dam Spillway
Share

The National Litani River Authority stated in a press release that "within the framework of the comprehensive periodic monitoring program for the Qaraoun Dam, implemented by the dam monitoring team according to an action plan including daily, weekly, monthly, and annual inspection rounds, the team conducted a field inspection of the spillway to monitor its technical and structural condition and ensure its safety and proper performance."

The results of the inspection showed no new leaks were recorded, and no developments appeared regarding previously registered leak cases, which the Authority will address as soon as possible in accordance with approved technical and engineering standards.

The inspection results also indicated that all other parts of the spillway are in very good technical and structural condition.

The Authority confirmed the continuation of periodic monitoring, preventive maintenance, and technical treatment operations, ensuring the safety of the dam and its facilities and their proper performance.

Add Daily Beirut to your Google News feed to get the latest first.
Share